  • CSL Testing at India’s prestigious Bandra Worli Sealink Project
  • PDA Testing at the longest railway bridge in India for RVNL at Cochin
  • PDA Testing for longest r.c. bored piles of 72m at Cochin
  • PDA Testing using a heavy 35 tons hammer for 1600mm r.c. bored pile at Delhi. This is the heaviest hammer used till date for dynamic pile testing in India.
  • Complete Foundation Quality Assurance for India’s first Monorail Job at Mumbai
  • Introduced Non Destructive Testing at Delhi and other metro projects, power projects across the country.
  • Pile Foundations at India’s first expressway from Vadodara to Ahmedabad Phase:II are tested by Geo Dynamics
  • Complete drivability analysis, pile monitoring, capacity computation provided for 1422mm open ended steel pipe piles in India. 
  • Conducted UPV Testing for 84m high Silo at Rajasthan